Limestone transportation of the Second Phase of CSKC 3200 tpd clinker production line connected
DATE:
2016-06-07
AUTHOR:
方芳
On May 8th, 2016, Limestone transportation of the Second Phase of CSKC 3200 tpd clinker production line was connected, which means the pilot production period of the project.