Limestone transportation of the Second Phase of CSKC 3200 tpd clinker production line connected
DATE: 2016-06-07 AUTHOR: 方芳
On May 8th, 2016, Limestone transportation of the Second Phase of CSKC 3200 tpd clinker production line was connected, which means the pilot production period of the project.
Copyright: Anhui Conch Group Ltd Address: No. 39 Wenhua Road, Wuhu City, Anhui province
Tel: 0553-8398999 8398971 (website maintenance) Anhui ICP No. 05009088